Case study of an upgrade control and fuel systems on Avon generator sets located on an offshore platform.

Case study of an upgrade for the GCP & AVR system as part of a revamp project of the overall turbine package.

Case study of an upgrade for the replacement of a Fire & Gas system at an Oil Pumping station.

Case study of a recently completed installation & commissioning of an RB211 turbine and process control system for a UK based offshore compressor installation.